Register | Industrial Express | Forum | Sign In | AdServices | My Workroom
  Industrial | Tech Info | Thesis| Exhibition info | Laws & Regulations | Blueprint |
 

Offer to sell | Offer to buy | Public bidding | Recruitment | Products | Companies | |Set As default | 中文

Your current position:Home > Industrial Express > Public bidding
  Public bidding
Public bidding

                   Release time: 2006-12-2 12:08:54     Visit frequency: 117

Whole Doc.
The following regulations on contracted operation of Chinese-foreign
equity joint ventures (hereinafter referred to as joint ventures) are
aimed at guaranteeing the normal development of these enterprises.

Article 1 Definition of contracted operation
The contracted operation mentioned in these regulations is meant for
joint ventures which, by signing contracts, offer the whole or part of
their operational rights to contractors for a certain period of time while
those joint ventures are managed by the contractors. Such forms of
contracted operation are but supplementary measures to help those poorly
managed and loss-making joint ventures. During the contracting term, the
contractor takes on the risks of operation while gaining part of the joint
venture's profits.

Article 2 Requirements for contracted operation of joint ventures
A joint venture shall fulfill the following requirements to practice
contracted operation:
(1) That it is a project in an industry encouraged or permitted by
State policy. However, key state projects, those in energy or
communications in particular, shall not practice contracted operation.
(2) That the Chinese and foreign partners of the joint venture have
fully provided the investment required by contract and the payment has
been verified-but the joint venture is hardly likely to survive because of
poor management.

Article 3 Contractors' qualifications
A contractor must have the following qualifications:
(1) That it is a Chinese or foreign corporation or enterprise with
the qualification of a legal person, and has engaged in business operation
for at least 3 years;
(2) That is belongs to the same industry as the joint venture and can
work out a concrete plan to effectively help the business make up deficits
and return to normal development; and
(3) That it is able to provide adequate risk deposit and a
letter-of-guarantee for the risk-guaranty money.

Article 4 Basic requirements for contracted operation
(1) The contractor can be chosen through public bidding (i.e., the
joint venture conducts public bidding in accordance with the conditions
worked out by the board of directors); alternatively, the joint venture
can sign directly an agreement on contracted operation with the contractor
(either partner of the venture or a third party) in accordance with the
decision made by the board of directors.
(2) The legal-person status, name and business scope of the joint
venture shall not be changed because of contracted operation.
(3) As the operator and manager of the joint venture's property, the
contractor shall strictly carry out the contract and be under the
supervision of the venture's board of directors. The contractor has no
right to dispose of the joint venture's property, such as transfer,
selling off, removing, mortgaging, leasing or giving out as a present. The
contractor shall regularly submit factual financial reports to the joint
venture's board of directors.
(4) The contracting term is usually set at 1 to 3 years. The maximum
shall be no more than 5 years. The contractor shall see to it that the
joint venture becomes profitable or at least its performance is improved
remarkably when the contracting term expires.
(5) Contracting shall only cover the joint venture's after-tax
profits. Both parties to such contracts shall decide on the annual profit
Information sources:   Releaser: China Electric Engineering Online
Check up comments】(Have 0   comments Count)
  Related information
Xinjiang Sell..
06-12-02 12:06 China Issues&..
06-12-02 12:05
  Commentary
UserName:
PassWord:
Content:
    
  Latest Demand Info
· [Demand]Chrome Ore&nb.. 06-12-10
· [Demand]Bitumen 06-12-10
· [Demand]Electrolytic .. 06-12-10
· [Demand]Ndfeb Magnet&.. 06-12-10
· [Demand]Magnet Loop 06-12-10
· [Demand]Cummins Genset 06-12-10
· [Demand]Brake Pad,&nb.. 06-12-10
· [Demand]PTA and .. 06-12-10
· [Demand]Spathic Silicon 06-12-10
· [Demand]Bonded Poly&n.. 06-12-10
  Latest Supply Info
· [Supply]Far East .. 06-12-12
· [Supply]Dry Type .. 06-12-12
· [Supply]Series 10&nbs.. 06-12-12
· [Supply]Series 9 .. 06-12-12
· [Supply]Dry Type .. 06-12-12
· [Supply]Rectifying Tr.. 06-12-12
· [Supply]Polisher 06-12-12
· [Supply]YCT electroma.. 06-12-12
· [Supply]YVF  06-12-12
· [Supply]YD  06-12-12
  suggestions
 Title:
Content:
E_mail:
About us |Contact us |Welcome to cooperate |Privacy statement |Copyright |Web site | Advertising Services | Links | 中文
Special Announcement: The intellectual property of the website belongs to China Electric Engineering Online,
any republication, extraction, duplication or mirror image will not be allowed without permission .
Copyrigh©2006-2008 WWW.CNELEC.NET.CN Rights Reserved
Advertising License: Get network name:xxxxxx A Web site:xxxxxx
ICP License:05012951
Business:xxxxxx